The hot selling high stretch pants of Oak Doer’s item no. is 2030,named CUCCITINI.The main fabric is 92%polyester 8%spandex 240gsm with waterproof treatment(We will enjoy rainy days).We have finished 20000prs mass production,now let us introduce more details when making this mass production.
Firstly,when we receive the fabric mass production,we will make different size samples for testing before mass production.We ironed the pants down by 150℃,then measure the dimensions according to our size chart,then we will put the pants in washing machine,washing at 40℃ 30mins,shaking dry 5mins.Then we will repeat the above procedure.When the pants are completely dry,my designer will measure the dimensions for final confirmation.
Secondly,when the mass production fabrics arrive at the factory. It takes 24 hours to lay the cloth, and 4 hours to cut the cloth after the length is broken.Please pay attention to this time control, otherwise the fabric shrinkage time is not enough, the cut will continue to shrink, affecting the size of the garment.Light color will shrink more than dark color. After we put the fabric on our chopping board,the total length will be less than the number of meters on the outside of the rolls.The cloth should not be too thick when cut, it will slip and run the knife.Then the workers cut the fabrics carefully.
Thirdly,the stitching workers have pay more attention of the machines to confirm stitching pin size and quality.The pocket opening and other parts need to be ironed gently.The pants are with YKK zipper in front opening and SBS zippers on pockets,all the parts should stitch smooth and beautiful.
At last,the workers should use a large professional iron for ironing mass productions.For the purpose of stabilizing the size of the garment, consumers will not reduce the size after washing. If there is no large ironing machine, the length of the trousers may be shortened by 2cm after washing. This is the property of the cloth. For high gram weight, it may be better. As long as it is elastic fabric, it is necessary to pay attention to and do more tests, especially the elastic of the whole garment. We already have rich skills to make such products, Let us make orders now!
Post time: May-25-2023